Coordination Parameters
Coordination parameters for the current and upcoming IATA scheduling season
Runway System Capacity
Movements per | Arrivals | Departures | Total |
60 min | 20 | 15 | 28 |
10 min | 4 | 3 | 5 |
PAX Terminal Capacity
Departing Passengers Throughput |
|
Arriving Passengers Throughput |
|
Boarding gates |
|
Baggage Reclaim Carousels: | 4 |
NOTICE OF AIRPORT CAPACITY (NAC) CHART – WINTER DEPARTURES
NOTICE OF AIRPORT CAPACITY (NAC) CHART – WINTER ARRIVALS
NOTICE OF AIRPORT CAPACITY (NAC) CHART – SUMMER DEPARTURES
NOTICE OF AIRPORT CAPACITY (NAC) CHART – SUMMER ARRIVALS
Apron Capacity
Parking stands available in accordance with LZIB AIRCRAFT PARKING/DOCKING CHART – ICAO v AIP SR.
Slot Monitoring
Slots usage is monitored in line with IATA WSAG and WWACG Slot Performance Monitoring Guidelines against the following slots misuses:
- Operations at a time different than the allocated slot,
- Slot held but not operated,
- Operations with no slot allocated,
- Use of a slot in a different way than allocated (e.g. use of a different a/c type).
More in this section
13:40 | 13:20 | |
14:20 | 14:07 | |
14:55 | 14:55 |
09:45 | 13:46 | |
13:25 | 13:51 | |
14:30 | 14:30 |
Tip
Use of alternative transportation to the Airport
There is a public transport bus to M. R. Štefánik Airport no. 61 in the direction from the main railway station.